The Empress Lofts Laramie Wyoming

Request for Services - Lofts at the Empress

Cost Estimates for Downtown Residential Construction Project

Issued January 9, 2019

Laramie Main Street Alliance (LMSA), a 501(c)(3) non-profit striving to preserve historic Downtown Laramie while enhancing its economic and social vitality, seeks the services of a contractor or qualified firm to provide cost estimates for residential units at the Empress at 112 S. 2nd Street; built in 2018 as a mixed use, infill project in the heart of downtown Laramie (formerly home to the historic Empress, then Fox Theater, demolished in 2009).

LMSA desires to develop the top floor of the Empress, approximately 3,600 square feet, into three, two bedroom one bath units with “Industrial Chic” finishes including mid grade finishes, sleek, clean lines, polished concrete floor, salvaged items, reclaimed wood and metal fixtures.

The space is currently raw but includes a concrete floor, plumbing rough ins, fire rated windows, an elevator, stairwell and ceiling mounted natural gas heating units.

Expected Deliverables: You or your company should complete the following:

  • Review the drawings (attached), a walkthrough of the building to review the space, take any necessary measurements, and discuss vision with LMSA.

  • An itemized list with ROM cost estimates. (Rough Order of Cost Magnitude)

Project Budget: As a 501(c)(3) non-profit, LMSA is prepared to offer your firm a tax deduction for the value of your time providing cost estimates.

Project Timeline

  • Request for services issued January 9, 2019

  • Walk through space/open house on January 18 from 10 to 11 am and 2 to 3 pm

  • Responses postmarked or hand delivered by February 8, 2019 to LMSA at 115 Ivinson Avenue, Laramie, WY 82070

Please Include

  • Name of your company, with contact information

  • Short bio of staff member completing the work

  • List of projects that your company has worked on that are similar in scope

  • A brief description of your firm’s cost estimate approach for the project

  • Proof of your professional licensure

Contact Information: If you have questions about this request, reach out to: Trey Sherwood, Executive Director, 115 E. Ivinson Avenue, Laramie, WY 82070. 307-760-3355 or DowntownLaramie@gmail.com

Project Team: Trey Sherwood, LMSA, Marla Peterson and Chaz Avila, Downtown Development Authority board members.